Work in Progress


[hr]

Commercial Project Foundation

A 5000 sf multi-use structure. Slab on grade, reinforced 12″ retaining walls as a structural support for the 2nd level, and suspended slab. Site work included paving, landscape and water features. Finishes include imported birch for wall and ceiling and flagstone and travertine for flooring.

[slideshow id=8]

Back to Top

[hr]

Concrete Pour

[slideshow id=7]

Back to Top

[hr]

Deck Roofing

Back to Top

[hr]

Alamo Rental Cars

Installed two canopies near Honolulu Airport for Alamo Car Rental.

Alamo Car Rental Work in Progress

Back to Top

Leave a Reply

Your email address will not be published. Required fields are marked *